Best Housing, Construction & Development Lawyers in Bueng Kum
Share your needs with us, get contacted by law firms.
Free. Takes 2 min.
Free Guide to Hiring a Real Estate Lawyer
List of the best lawyers in Bueng Kum, Thailand
We haven't listed any Housing, Construction & Development lawyers in Bueng Kum, Thailand yet...
But you can share your requirements with us, and we will help you find the right lawyer for your needs in Bueng Kum
Find a Lawyer in Bueng KumThailand Housing, Construction & Development Legal Questions answered by Lawyers
Browse our 1 legal question about Housing, Construction & Development in Thailand and the lawyer answers, or ask your own questions for free.
- Property in Phuket
- I bought a property in Phuket in 2019 and it should be completed at the end of 2021 but the project was delayed. I paid nearly full payment but now I cannot contact the project owner anymore. Please kindly advise what I should do. Thanks.
-
Lawyer answer by GPS Legal
Thank you for your question. My name is Dave Lind, Director-Client Services at GPS-Legal. GPS has extensive experience in property matters in Thailand. In terms of what you should do, if you have exhausted your ability to rectify this situation...
Read full answer
About Housing, Construction & Development Law in Bueng Kum, Thailand
Bueng Kum is a district of Bangkok, so housing, construction, and development are governed by national Thai laws together with Bangkok Metropolitan Administration rules and the Bangkok Comprehensive Plan. If you are building, renovating, purchasing, selling, or developing property in Bueng Kum, you must consider land use zoning, building control, environmental and safety standards, and registration procedures at the local district office and relevant central agencies. The legal framework is designed to ensure safe structures, compatible land use, transparent transactions, and protection for buyers and neighbors.
Key national statutes include the Building Control Act B.E. 2522, the Land Code B.E. 2497, the Condominium Act B.E. 2522, the Town and City Planning Act B.E. 2518, the Land Allocation Act B.E. 2543, the Civil and Commercial Code, the Enhancement and Conservation of National Environmental Quality Act B.E. 2535, and labor and safety laws. In Bangkok, the city plan sets zoning and density limits and the Bueng Kum District Office administers permits and inspections for most buildings within the district.
Why You May Need a Lawyer
Many people in Bueng Kum seek legal help to navigate permits, contracts, and disputes that arise during property transactions and construction. A lawyer can review and draft contracts, verify land title and zoning, reduce regulatory risk, and help resolve conflicts before they escalate.
Common situations include off-plan condominium purchases, delays or defects by contractors, land boundary and encroachment issues, neighbor nuisance from construction noise or dust, foreign ownership structures for homes or condominium units, subdivision and land allocation approvals, change of use for a building, EIA-triggering projects, and compliance problems that can lead to fines or stop-work orders. Early legal advice can save time and cost by aligning your project with the correct approvals and by managing risk in procurement and construction contracts.
Local Laws Overview
Zoning and city planning. Bueng Kum is subject to the Bangkok Comprehensive Plan, which designates color-coded zones and sets rules on permitted uses, floor area ratio, open space ratio, height, and setbacks. Your proposed use must match the zone. Some uses require extra approvals or are prohibited in certain areas. Always verify the current zoning sheet and regulations for the specific parcel.
Building permits and control. Most new buildings, major renovations, structural changes, and changes of use require a building permit under the Building Control Act. Applications are filed with the Bueng Kum District Office Public Works unit. Plans must be signed by a licensed architect or engineer. The authority reviews structural safety, fire protection, setbacks, parking, access, drainage, and compliance with zoning. Standard applications often have a statutory review period that can be around 45 days for straightforward cases, but complex or large projects can take longer.
Setbacks, heights, and fire safety. Minimum setbacks from boundaries and roads depend on building height and use. Taller buildings generally require larger setbacks and more on-site parking. Fire safety standards apply to stairways, exits, fire rating of materials, and active protection systems. Condominium and high-rise projects have additional rules on refuge areas and fire command facilities.
Environmental and nuisance controls. Construction activities must control dust, noise, water runoff, and waste. Some projects must conduct an environmental impact assessment if they meet thresholds set by environmental regulations. Work hour restrictions can apply in residential areas. Non-compliance can lead to fines or suspension orders by the district office or environmental authorities.
Land and title. The Department of Lands maintains the cadastre and issues land title documents such as Chanote. Any sale, mortgage, long-term lease, usufruct, superficies, or servitude must be registered at the competent land office to be fully effective against third parties. Boundary disputes and encroachments are handled through surveys and, if needed, civil procedures.
Condominiums and housing estates. The Condominium Act governs establishment, unit sales, foreign ownership quotas, common property, and the condominium juristic person. The Land Allocation Act regulates subdivision for housing estates, requiring approval of roads, utilities, and common areas before sale of plots.
Contracts and consumer protection. Construction and sale agreements are governed by the Civil and Commercial Code. Clauses on scope, price, milestones, variation orders, time extensions, liquidated damages, warranties, and dispute resolution are critical. Developers selling to consumers must follow advertising and contract standards enforced by consumer protection regulators.
Workplace safety and labor. Contractors must comply with occupational safety rules, worker insurance, and site safety plans. Accidents can trigger administrative penalties and civil liability. Owners can face risk if they fail to appoint qualified professionals or oversee safety obligations imposed by law.
Dispute resolution. Contract and property disputes can be resolved by negotiation, mediation, arbitration, or court. Administrative decisions such as permit refusals or stop-work orders may be challenged in the Administrative Court within prescribed time limits.
Frequently Asked Questions
Do I need a building permit for renovations in Bueng Kum
Cosmetic works such as repainting or replacing finishes usually do not require a permit. Structural changes, adding floors, altering load-bearing elements, changing the building footprint, or changing the use of the building generally require a permit from the Bueng Kum District Office. When in doubt, consult a licensed architect or engineer and confirm with the district office before starting work.
How does zoning affect what I can build or use the property for
Zoning determines permitted uses, density, maximum height, and parking. For example, a residential zone may allow houses and low-rise apartments but restrict factories or certain commercial uses. FAR and open space rules limit how much floor area you can build. Always check the exact plot against the Bangkok Comprehensive Plan and any specific announcements that apply to the area.
What are the typical setbacks and height limits
Setbacks and height vary by road width, building height, and use. As a rule of thumb, low-rise houses require smaller setbacks, while mid-rise and high-rise buildings require larger setbacks and step-backs. Buildings near narrow roads often face stricter height caps. Your architect must calculate setbacks under the Building Control Act and related ministerial regulations for your specific scheme.
How long does a building permit take to obtain
For standard low-rise projects with complete documents, a decision can often be expected in about 45 days, though this is not guaranteed. Incomplete submissions, deviations from zoning, traffic impact concerns, or special fire safety reviews can extend the timeline. Large or complex projects can take several months.
When is an environmental impact assessment required
Only certain categories of projects that meet size or risk thresholds require an EIA under environmental regulations, for example large residential developments or high-rise buildings above specified sizes. The thresholds and required studies are set by the environmental authority. If your project is sizeable, seek early scoping advice from a qualified environmental consultant and legal counsel.
Can foreigners own land or homes in Bueng Kum
Foreigners generally cannot own land under the Land Code except under limited investment schemes. Foreigners can own condominium units up to the foreign quota, which is a percentage of the total sellable area in the condominium. Alternatives such as long-term leases, superficies, or company structures must be carefully evaluated for compliance. Always obtain tailored legal advice before committing.
What protections do buyers have when purchasing off-plan units
Developers must register the condominium or land allocation and use compliant sale contracts. Buyers should verify title, permits, developer track record, escrow or payment schedules, and completion timelines. Contract clauses on delay penalties, specifications, defects liability, and transfer procedures are critical. If a developer fails to deliver as promised, buyers may claim remedies under the contract and consumer laws.
How do I handle construction defects or delays by a contractor
Use a detailed written contract with clear scope, technical standards, quality control, milestones, retention, and liquidated damages for delay. Keep site records and issue timely notices for defects or delays. If issues persist, you can appoint an independent engineer to assess, withhold payment per contract, pursue mediation or arbitration if agreed, or sue for damages under the Civil and Commercial Code.
What if my construction disturbs neighbors with noise, dust, or encroaches on their land
Contractors must control nuisance and strictly observe boundary lines. Excessive nuisance can give rise to complaints, fines, and stop-work orders, and encroachment can lead to injunctions and damages. Conduct a boundary survey before construction, implement dust and noise controls, limit work to permitted hours, and resolve complaints early to avoid enforcement actions.
Do I need professional signatures on my plans
Yes. Most permit applications require plans signed and sealed by a licensed architect and or engineer. Certain categories of work also require supervision and certification by the responsible professionals during construction and at completion before occupancy is allowed.
Additional Resources
Bueng Kum District Office Public Works unit. The local authority that receives building permit applications, inspects works, and enforces building control within the district.
Bangkok Metropolitan Administration Department of Public Works and Department of City Planning. Citywide bodies overseeing building control policy, infrastructure coordination, and the Bangkok Comprehensive Plan.
Department of Lands and Bangkok Metropolitan Land Offices. Agencies responsible for land title verification, registration of transfers, mortgages, long-term leases, servitudes, and condominium registrations.
Office of Natural Resources and Environmental Policy and Planning. The national authority overseeing environmental impact assessment procedures and approvals.
Architects Council of Thailand and Council of Engineers. Professional regulators for licensing architects and engineers who must sign and supervise plans and construction.
Office of the Consumer Protection Board. Regulator for consumer issues including housing and condominium sales contracts and advertising standards.
Thai Arbitration Institute and Thailand Arbitration Center. Institutions that provide arbitration and mediation services for construction and real estate disputes.
Central Administrative Court. Court with jurisdiction to review administrative orders such as permit refusals or stop-work orders within legal time limits.
Office of Insurance Commission. Regulator for contractors all risks insurance, professional indemnity, and other policies relevant to construction risk management.
Department of Labour Protection and Welfare. Authority for workplace safety and labor compliance at construction sites.
Next Steps
Clarify your goal. Define whether you plan to buy, build, renovate, change use, subdivide, or sell. Identify the exact property or site and your intended timeline and budget.
Gather documents. Collect title deeds, previous permits, as-built drawings, utility maps, company documents, and any sales or construction contracts. Accurate documents shorten approval times and reduce risk.
Check zoning and constraints. Ask a licensed architect or planner to review the Bangkok Comprehensive Plan for your plot and to outline feasible use, FAR, height, setbacks, parking, and any special overlays.
Assemble the professional team. Engage a Thai licensed architect and or engineer for design and permitting, and a quantity surveyor if needed. Consider appointing an environmental consultant for larger projects.
Obtain legal review. Have a local real estate and construction lawyer review contracts, verify title and encumbrances at the land office, confirm permit pathways, and advise on risk allocation, insurance, and dispute resolution clauses.
Plan compliance and stakeholder management. Prepare realistic permit timelines, community and neighbor communication, site safety plans, and environmental controls. Keep meticulous records and approvals during construction.
If a dispute arises, act early. Use the contract notice procedures, explore mediation, and escalate to arbitration or court if necessary. For administrative issues, note deadlines for appeals or judicial review. A lawyer can guide the strategy that best fits your case and timeline.
Disclaimer:
The information provided on this page is for general informational purposes only and does not constitute legal advice. While we strive to ensure the accuracy and relevance of the content, legal information may change over time, and interpretations of the law can vary. You should always consult with a qualified legal professional for advice specific to your situation. We disclaim all liability for actions taken or not taken based on the content of this page. If you believe any information is incorrect or outdated, please contact us, and we will review and update it where appropriate.